Savant Energy

TDSP Delivery Charge Calculator

Texas utility (TDSP) delivery charges per kWh, from PUC rates effective Nov 1, 2026. Residential is a simple per-kWh rate; commercial meters over 10 kW (5 kW for TNMP) are billed mostly on demand, so the 6.5333¢ on the PUC page is not their rate.

Most accurate. Use the client's latest bill.

Tip: add every line under TDU / Delivery charges (customer, metering, distribution, transmission, riders). Leave out the supplier's energy charge and taxes.

Quick reference

Residential and small-commercial columns are the PUC per-kWh line. The last three columns are estimates of the all-in delivery rate for a 50 kW (kVA for CenterPoint) non-IDR commercial meter at 30%, 50% and 70% load factor, worked out from the same PUC rates.

Small-commercial meters also pay a few dollars a month in fixed customer and metering charges, which the calculator adds. TNMP's small class is under 5 kW. Load factor = kWh ÷ (kW × 730). The steadier the load (higher load factor), the lower the ¢/kWh.

Notes and sources